{"id":20319,"date":"2025-08-01T12:19:53","date_gmt":"2025-08-01T12:19:53","guid":{"rendered":"https:\/\/wp-api.pocketful.in\/blog\/?post_type=ipo&#038;p=20319"},"modified":"2025-08-01T12:31:02","modified_gmt":"2025-08-01T12:31:02","slug":"m-and-b-engineering-limited-ipo-allotment-status","status":"publish","type":"ipo","link":"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/","title":{"rendered":"M And B Engineering Limited IPO Allotment Status: Check GMP, Subscription Status"},"content":{"rendered":"\n<p>The size of M&amp;B Engineering IPO is \u20b9650 crore, which includes a fresh issue of \u20b9275 crore and an OFS of \u20b9375 crore. The issue will remain open from July 30 to August 1, 2025. The price band has been fixed at \u20b9366-\u20b9385 per share. Its listing is expected on BSE and NSE on August 6.&nbsp;<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-transparent ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#M_B_Engineering_IPO_Day_3_Subscription_Status\" title=\"M&amp;B Engineering IPO Day 3 Subscription Status\">M&amp;B Engineering IPO Day 3 Subscription Status<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#How_to_Check_M_B_Engineering_IPO_Allotment_Status\" title=\"How to Check M&amp;B Engineering IPO Allotment Status\">How to Check M&amp;B Engineering IPO Allotment Status<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#Objective_of_the_M_B_Engineering_IPO\" title=\"Objective of the M&amp;B Engineering IPO\">Objective of the M&amp;B Engineering IPO<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#M_B_Engineering_IPO_GMP_%E2%80%93_Day_3_Update\" title=\"M&amp;B Engineering IPO GMP \u2013 Day 3 Update\">M&amp;B Engineering IPO GMP \u2013 Day 3 Update<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#M_B_Engineering_IPO_%E2%80%93_Key_Details\" title=\"M&amp;B Engineering IPO &#8211; Key Details\">M&amp;B Engineering IPO &#8211; Key Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#Important_Dates_for_M_B_Engineering_IPO_Allotment\" title=\"Important Dates for M&amp;B Engineering IPO Allotment\">Important Dates for M&amp;B Engineering IPO Allotment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#M_B_Engineering_Overview\" title=\"M&amp;B Engineering Overview\">M&amp;B Engineering Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#Frequently_Asked_Questions_FAQs\" title=\"Frequently Asked Questions (FAQs)\">Frequently Asked Questions (FAQs)<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\" id=\"h-m-amp-b-engineering-ipo-day-3-subscription-status\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_IPO_Day_3_Subscription_Status\"><\/span>M&amp;B Engineering IPO Day 3 Subscription Status<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>M&amp;B Engineering IPO has got tremendous response from investors. The overall subscription of the IPO has now reached 38.11 times. Retail investors have subscribed 34.36 times, QIB 38.63 times, and NII investors 40.22 times. Employees category has also been subscribed 8.59 times.<\/p>\n\n\n\n<figure class=\"wp-block-table has-small-font-size\"><table><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Investor Category<\/th><th class=\"has-text-align-center\" data-align=\"center\">Subscription (x)<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Qualified Institutional Buyers (QIB)<\/td><td class=\"has-text-align-center\" data-align=\"center\">38.63<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Non-Institutional Investors (NII)<\/td><td class=\"has-text-align-center\" data-align=\"center\">40.22<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">bNII (above \u20b910 lakh)<\/td><td class=\"has-text-align-center\" data-align=\"center\">39.68<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">sNII (less than \u20b910 lakh)<\/td><td class=\"has-text-align-center\" data-align=\"center\">41.31<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Retail Individual Investors (RII)<\/td><td class=\"has-text-align-center\" data-align=\"center\">34.36<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Employee Quota<\/td><td class=\"has-text-align-center\" data-align=\"center\">8.59<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Total&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">38.11<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Total Applications: 14,22,694<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-how-to-check-m-amp-b-engineering-ipo-allotment-status\"><span class=\"ez-toc-section\" id=\"How_to_Check_M_B_Engineering_IPO_Allotment_Status\"><\/span>How to Check M&amp;B Engineering IPO Allotment Status<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>M&amp;B Engineering IPO allotment can be easily checked online in two ways: from the Registrar&#8217;s website and from the BSE or NSE website. This IPO will be listed on both the exchanges &#8211; BSE and NSE, so the allotment status will be available to all investors on both platforms.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-method-1-registrar-s-website-mufg-intime-india-pvt-ltd\">Method 1: Registrar&#8217;s website (MUFG Intime India Pvt. Ltd.)<\/h4>\n\n\n\n<p>The most reliable way is to check allotment from MUFG Intime India Private Limited&#8217;s website.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-how-to-do\">How to do:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Visit MUFG Intime&#8217;s official <a href=\"https:\/\/in.mpms.mufg.com\/Initial_Offer\/public-issues.html\">website<\/a><\/li>\n\n\n\n<li>Select \u201cM&amp;B Engineering Ltd.\u201d from the IPO list<\/li>\n\n\n\n<li>Enter your details PAN number, Application number, or DP\/Client ID<\/li>\n\n\n\n<li>Click on Submit<\/li>\n\n\n\n<li>You will see the allotment status on the screen.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-method-2-check-from-bse-or-nse-s-website\">Method 2: Check from BSE or NSE&#8217;s website<\/h4>\n\n\n\n<p>If there is more traffic on the registrar&#8217;s website, allotment status can also be checked from BSE or NSE.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-how-to-do-0\">How to do:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Visit <a href=\"https:\/\/www.bseindia.com\/investors\/appli_check.aspx\">BSE <\/a>or <a href=\"https:\/\/www.nseindia.com\/invest\/check-trades-bids-verify-ipo-bids\">NSE&#8217;s <\/a>official website<\/li>\n\n\n\n<li>Select \u2018Equity\u2019 segment<\/li>\n\n\n\n<li>Select \u201cM&amp;B Engineering Ltd.\u201d from the IPO list<\/li>\n\n\n\n<li>Enter PAN number and Application number<\/li>\n\n\n\n<li>Click on Search<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-objective-of-the-m-amp-b-engineering-ipo\"><span class=\"ez-toc-section\" id=\"Objective_of_the_M_B_Engineering_IPO\"><\/span>Objective of the M&amp;B Engineering IPO<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>M&amp;B Engineering Company will use the funds raised from this IPO to expand its business and strengthen its finances. The company will invest these funds in important areas such as purchase of machinery, solar grid setup, loan repayment and IT upgradation.<\/p>\n\n\n\n<figure class=\"wp-block-table has-small-font-size\"><table><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Use of IPO Proceeds<\/th><th class=\"has-text-align-center\" data-align=\"center\">Amount (\u20b9 Cr)<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Procurement of machinery, equipment, building works, solar rooftop grids and transport vehicles for manufacturing facilities<\/td><td class=\"has-text-align-center\" data-align=\"center\">130.58<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Investment in IT software upgradation by the company<\/td><td class=\"has-text-align-center\" data-align=\"center\">5.20<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Partial or full repayment \/ prepayment of certain term loans taken by the company<\/td><td class=\"has-text-align-center\" data-align=\"center\">58.75<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Use for general corporate needs<\/td><td class=\"has-text-align-center\" data-align=\"center\">\u2013<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-m-amp-b-engineering-ipo-gmp-day-3-update\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_IPO_GMP_%E2%80%93_Day_3_Update\"><\/span>M&amp;B Engineering IPO GMP \u2013 Day 3 Update<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The grey market premium (GMP) of M&amp;B Engineering IPO today is \u20b951, updated as of 3:30 PM on 1 August 2025. The price band of the IPO is \u20b9385, and the estimated listing price based on today\u2019s GMP could be \u20b9436, giving a potential return of around 13.25% per share.<\/p>\n\n\n\n<figure class=\"wp-block-table has-small-font-size\"><table><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Date<\/th><th class=\"has-text-align-center\" data-align=\"center\">GMP<\/th><th class=\"has-text-align-center\" data-align=\"center\">Est. Listing Price&nbsp;<\/th><th class=\"has-text-align-center\" data-align=\"center\">Gain (%)<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">1 August 2025 (DAY-3)<\/td><td class=\"has-text-align-center\" data-align=\"center\">\u20b951<\/td><td class=\"has-text-align-center\" data-align=\"center\">\u20b9436<\/td><td class=\"has-text-align-center\" data-align=\"center\">13.25%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Disclaimer: <\/strong>The above GMP (Grey Market Premium) is just unofficial market information, which is not officially confirmed. These figures are shared for informational purposes only and investment decisions based on these should be based on the investor&#8217;s own research and discretion. We do not conduct, recommend or support any kind of transaction in the grey market.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-m-amp-b-engineering-ipo-key-details\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_IPO_%E2%80%93_Key_Details\"><\/span>M&amp;B Engineering IPO &#8211; Key Details<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table has-small-font-size\"><table><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Particulars<\/th><th class=\"has-text-align-left\" data-align=\"left\">Details<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">IPO Opening Date<\/td><td class=\"has-text-align-left\" data-align=\"left\">July 30, 2025<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">IPO Closing Date<\/td><td class=\"has-text-align-left\" data-align=\"left\">August 1, 2025<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Issue Price Band<\/td><td class=\"has-text-align-left\" data-align=\"left\">\u20b9366 to \u20b9385 per share<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Total Issue Size<\/td><td class=\"has-text-align-left\" data-align=\"left\">1,68,83,116 shares(aggregating up to \u20b9650.00 Cr)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Listing Platform<\/td><td class=\"has-text-align-left\" data-align=\"left\">BSE, NSE<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Registrar<\/td><td class=\"has-text-align-left\" data-align=\"left\">MUFG Intime India Private Limited<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">M&amp;B Engineering IPO DRHP<\/td><td class=\"has-text-align-left\" data-align=\"left\"><a href=\"https:\/\/www.sebi.gov.in\/filings\/public-issues\/feb-2025\/mandb-engineering-limited-drhp_92107.html\">Click Here<\/a><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">M&amp;B Engineering IPO RHP<\/td><td class=\"has-text-align-left\" data-align=\"left\"><a href=\"https:\/\/www.sebi.gov.in\/filings\/public-issues\/jul-2025\/mandb-engineering-limited-rhp_95585.html\">Click Here<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-important-dates-for-m-amp-b-engineering-ipo-allotment\"><span class=\"ez-toc-section\" id=\"Important_Dates_for_M_B_Engineering_IPO_Allotment\"><\/span>Important Dates for M&amp;B Engineering IPO Allotment<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table has-small-font-size\"><table><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Event<\/th><th class=\"has-text-align-center\" data-align=\"center\">Date<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Tentative Allotment<\/td><td class=\"has-text-align-center\" data-align=\"center\">Aug 4, 2025<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Refunds Initiation<\/td><td class=\"has-text-align-center\" data-align=\"center\">Aug 5, 2025<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Credit of Shares to Demat<\/td><td class=\"has-text-align-center\" data-align=\"center\">Aug 5, 2025<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Listing Date&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">Aug 6, 2025<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-m-amp-b-engineering-overview\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_Overview\"><\/span>M&amp;B Engineering Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>M&amp;B Engineering Limited was established in 1981 and since then, it has been engaged in the field of Pre-Engineered Buildings (PEBs) and Self-Supported Roofing Solutions. The company offers a complete design to installation solution to produce strong and durable steel structures.It has two manufacturing plants located at Sanand in Gujarat and Cheyyar in Tamil Nadu with a total production capacity of 1.03 lakh MTPA. The Phenix division specializes in PEB manufacturing, while the Proflex division manufactures roofing on site using mobile units. The company has completed over 9,500 projects so far.M&amp;B Engineering has clients from various sectors such as textiles, manufacturing, food, power and railways. The company exports its products to over 22 countries. Its order book stands at over \u20b9842 crore as of June 2025, reflecting its strong market position.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-frequently-asked-questions-faqs\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions_FAQs\"><\/span>Frequently Asked Questions (FAQs)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n<div class=\"saswp-faq-block-section\"><ol style=\"list-style-type:none\"><li style=\"list-style-type: none\"><h3 class=\"\">What is the opening and closing date of M&amp;B Engineering IPO?<\/h3><p class=\"saswp-faq-answer-text\">M&amp;B Engineering IPO is open on 30th July 2025 and will close on 1st August 2025.<\/p><li style=\"list-style-type: none\"><h3 class=\"\">What is the price band of M&amp;B Engineering IPO?<\/h3><p class=\"saswp-faq-answer-text\">Its price band is fixed from \u20b9366 to \u20b9385 per share.<\/p><li style=\"list-style-type: none\"><h3 class=\"\">What is the GMP (Grey Market Premium) of M&amp;B Engineering IPO today?<\/h3><p class=\"saswp-faq-answer-text\">The GMP on 1 Aug 2025 is \u20b951, which leads to a possible listing price of \u20b9436.<\/p><li style=\"list-style-type: none\"><h3 class=\"\">What is the total issue size of M&amp;B Engineering IPO?<\/h3><p class=\"saswp-faq-answer-text\">The total issue size of the IPO is \u20b9650 crore, which includes a fresh issue of \u20b9275 crore and an offer for sale of \u20b9375 crore.<\/p><li style=\"list-style-type: none\"><h3 class=\"\">What is the expected listing date of M&amp;B Engineering?<\/h3><p class=\"saswp-faq-answer-text\">This IPO will get listed on BSE and NSE on August 6, 2025.<\/p><\/ul><\/div>","protected":false},"excerpt":{"rendered":"<p>The size of M&amp;B Engineering IPO is \u20b9650 crore, which includes a fresh issue of \u20b9275 crore and an OFS of \u20b9375 crore. The issue will remain open from July 30 to August 1, 2025. The price band has been fixed at \u20b9366-\u20b9385 per share. Its listing is expected on BSE and NSE on August [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":20326,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[183],"class_list":["post-20319","ipo","type-ipo","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo"],"acf":{"freelancer":"Harjyot"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v20.13 (Yoast SEO v21.2) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>M And B Engineering Limited IPO Allotment Status: Check GMP, Subscription Status<\/title>\n<meta name=\"description\" content=\"M&amp;B Engineering IPO Day 3 subscribed 38.11 times. Check GMP, price band, issue size, listing date, allotment details, and how to check allotment status.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"M And B Engineering Limited IPO Allotment Status: Check GMP, Subscription Status\" \/>\n<meta property=\"og:description\" content=\"M&amp;B Engineering IPO Day 3 subscribed 38.11 times. Check GMP, price band, issue size, listing date, allotment details, and how to check allotment status.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/\" \/>\n<meta property=\"og:site_name\" content=\"Pocketful\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Pocketful.HQ\/\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-01T12:31:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/wp-api.pocketful.in\/blog\/wp-content\/uploads\/2025\/08\/MB-Engineering-IPO-Allotment-Status.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1497\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Pocketful_HQ\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"M And B Engineering Limited IPO Allotment Status: Check GMP, Subscription Status","description":"M&B Engineering IPO Day 3 subscribed 38.11 times. Check GMP, price band, issue size, listing date, allotment details, and how to check allotment status.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"M And B Engineering Limited IPO Allotment Status: Check GMP, Subscription Status","og_description":"M&B Engineering IPO Day 3 subscribed 38.11 times. Check GMP, price band, issue size, listing date, allotment details, and how to check allotment status.","og_url":"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/","og_site_name":"Pocketful","article_publisher":"https:\/\/www.facebook.com\/Pocketful.HQ\/","article_modified_time":"2025-08-01T12:31:02+00:00","og_image":[{"width":1497,"height":1080,"url":"https:\/\/wp-api.pocketful.in\/blog\/wp-content\/uploads\/2025\/08\/MB-Engineering-IPO-Allotment-Status.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Pocketful_HQ","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/","url":"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/","name":"M And B Engineering Limited IPO Allotment Status: Check GMP, Subscription Status","isPartOf":{"@id":"https:\/\/wp-api.pocketful.in\/blog\/#website"},"datePublished":"2025-08-01T12:19:53+00:00","dateModified":"2025-08-01T12:31:02+00:00","description":"M&B Engineering IPO Day 3 subscribed 38.11 times. Check GMP, price band, issue size, listing date, allotment details, and how to check allotment status.","breadcrumb":{"@id":"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wp-api.pocketful.in\/blog\/ipo\/m-and-b-engineering-limited-ipo-allotment-status\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog Home","item":"https:\/\/wp-api.pocketful.in\/blog\/"},{"@type":"ListItem","position":2,"name":"M And B Engineering Limited IPO Allotment Status: Check GMP, Subscription Status"}]},{"@type":"WebSite","@id":"https:\/\/wp-api.pocketful.in\/blog\/#website","url":"https:\/\/wp-api.pocketful.in\/blog\/","name":"Pocketful blog","description":"Learn Stock market trading, investing &amp; more","publisher":{"@id":"https:\/\/wp-api.pocketful.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wp-api.pocketful.in\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/wp-api.pocketful.in\/blog\/#organization","name":"Pocketful","alternateName":"Pocketful Broker","url":"https:\/\/wp-api.pocketful.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wp-api.pocketful.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/cms-resources.pocketful.in\/blog\/wp-content\/uploads\/2023\/08\/Logo_Final-01-1-3-1.png","contentUrl":"https:\/\/cms-resources.pocketful.in\/blog\/wp-content\/uploads\/2023\/08\/Logo_Final-01-1-3-1.png","width":150,"height":26,"caption":"Pocketful"},"image":{"@id":"https:\/\/wp-api.pocketful.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Pocketful.HQ\/","https:\/\/twitter.com\/Pocketful_HQ","https:\/\/www.linkedin.com\/company\/pocketfulofprofits\/","https:\/\/www.instagram.com\/pocketful.official\/"]}]}},"article_history_entries":[{"type":"Edit","author":{"id":7,"name":"Pocketful Team","url":"pocketful"},"content":"Post created","date":"2025-08-01 12:11:28","id":"ah_688caef0b45281.65759666"}],"image_url_featured":"https:\/\/cms-resources.pocketful.in\/blog\/wp-content\/uploads\/2025\/08\/MB-Engineering-IPO-Allotment-Status.jpg","_links":{"self":[{"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/ipo\/20319","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/ipo"}],"about":[{"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/types\/ipo"}],"author":[{"embeddable":true,"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/users\/10"}],"version-history":[{"count":3,"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/ipo\/20319\/revisions"}],"predecessor-version":[{"id":20332,"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/ipo\/20319\/revisions\/20332"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/media\/20326"}],"wp:attachment":[{"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/media?parent=20319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wp-api.pocketful.in\/blog\/wp-json\/wp\/v2\/categories?post=20319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}